Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Miami Fashion Week(R) Celebrates 10 Years With a Landmark Anniversary Edition, October 13-18, 2026

    October 26, 2026

    Zambezi Region records 33,944 malaria cases since January

    October 26, 2026

    South Korea surplus tops Germany and Japan combined in Q2

    October 26, 2026
    Facebook X (Twitter) Instagram
    Rabat Report: Morocco reported with wider context.Rabat Report: Morocco reported with wider context.
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • More
      • News
      • Sports
      • Technology
      • Travel
    Rabat Report: Morocco reported with wider context.Rabat Report: Morocco reported with wider context.
    Home » Gotion Secures 75% of Saudi Arabia’s First Utility-Scale BESS Tender
    PR Newswire

    Gotion Secures 75% of Saudi Arabia’s First Utility-Scale BESS Tender

    September 28, 2026
    Facebook Twitter Pinterest Telegram LinkedIn Tumblr WhatsApp Email
    Share
    Facebook Twitter LinkedIn Pinterest Telegram Email

    Chinese battery maker takes 75% of capacity with 25-year system life and desert-engineered storage technology.

    RIYADH, Saudi Arabia, Sept. 28, 2026 /PRNewswire/ — Saudi Power Procurement Company (SPPC) has awarded China’s Gotion High-Tech 6 GWh in the kingdom’s first utility-scale battery storage program—about 75% of the total tender, signaling how seriously Saudi Arabia is pursuing its 2030 energy transition goals. The G1 project totals 2 GW/8 GWh and is valued at roughly $1.16 billion. Gotion secured all three core sites—Al Muwayah, Haden and Al Kahafa—each 500 MW/2 GWh, making it the largest single technology supplier.

    The contract marks the first international large-scale deployment of Gotion Grid, its utility-scale storage system. Gotion says its edge is not price but engineering for extreme conditions. The system operates from -30°C to 55°C, uses a desert-optimized thermal management system that maintains full output during sandstorms and cuts high-temperature degradation by 40% versus conventional systems. It offers a 25-year design life, 25% longer than the industry average of 15–20 years, eliminating mid-life equipment replacement—a key factor for BOO contracts requiring 20-plus years of operation. An AI-powered battery management system enables intelligent dispatch, proactive safety warnings and full lifecycle diagnostics. All three sites can be remotely operated and integrated into Saudi Arabia’s 380 kV backbone grid.

    For investors, the award signals three shifts. Saudi storage procurement is moving faster than expected; G1 is awarded and G2 is underway, positioning Gotion for further phases. Competition is increasingly focused on lifecycle economics and extreme-environment performance over upfront pricing. Gotion is also building a regional footprint: roughly 9 GWh across the Middle East and North Africa, including a 1.5 GWh BESS in Egypt with a planned 3 GWh local manufacturing base, and a 1.2 GWh Morocco project with ACWA Power. Globally, its cumulative system-level storage projects exceed 10 GWh, including a 281 MW/843 MWh solar-storage project in Australia under construction and expected to reach commercial operation in 1H 2027.

    The Saudi award does not appear to be a one-off. As renewable penetration rises and grid stability becomes a priority, G1’s technical standards are likely to carry weight in future tenders. The question for Gotion is whether it can convert its early lead into sustained regional market share.

    Cision View original content:https://www.prnewswire.co.uk/news-releases/gotion-secures-75-of-saudi-arabias-first-utility-scale-bess-tender-302891502.html

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    Related Posts

    FL Technics Indonesia Secures EASA Certification for Bali Hangar, Expanding Capabilities to European Fleets

    October 26, 2026

    Sinopec Showcases Catalyst Innovation at Second International Catalyst Customer Conference in Tianjin

    October 26, 2026

    Canton Fair Expands Human-Centered Approach Through Shared Experiences, Culture and Dialogue

    October 26, 2026

    Drive to Great! BAIC FOTON Africa Partners Conference Set to Open

    October 25, 2026

    Camel Group at the 140th Canton Fair | LEV Battery Products Expand Its Multi-Technology Portfolio for Global Mobility

    October 23, 2026

    Getac’s Next Generation B360X and B360X Pro Fully Rugged Notebooks Bring Powerful Edge AI Performance to Frontline Professionals

    October 22, 2026
    Editor's Pick

    Zambezi Region records 33,944 malaria cases since January

    October 26, 2026

    South Korea surplus tops Germany and Japan combined in Q2

    October 26, 2026

    India and Poland agree to double bilateral trade by 2030

    October 24, 2026

    WHO calls for stronger Ebola surveillance in DR Congo

    October 24, 2026

    Strategic Expansion Boosts Russia-Oman Trade to $1.5 Billion, Shoigu Reports

    October 23, 2026

    Authorities Respond to Devastating Magnitude 7 Earthquake in Tibet with Rescue Efforts

    October 23, 2026

    Japan’s September Trade Deficit Reaches 536.6 Billion Yen Amid Rising Imports

    October 23, 2026
    © 2026 Rabat Report | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.